Use this worksheet to compare two machinery suppliers after you have a shortlist. Enter costs on the same scope through the first accepted part, then record the items each supplier still needs to confirm.
Give both suppliers the same job
Also give both suppliers the same delivery point, shop utilities and target production date. Ask each to list departures from the brief in writing.
Price the work through the first accepted part
A lower machine price can cost more by the time it produces an accepted part. For example, ask both suppliers who pays for rigging, whether the quoted tooling covers your sample part, and what support is included during the acceptance run.
Use a decimal point and up to two decimal places. Enter 0 for an item already priced elsewhere or confirmed to have no separate cost. For a required item the supplier excludes, enter a buyer-side estimate or leave the amount blank until it is priced.
| One-time cost | Quote A | Quote B |
|---|---|---|
| Machine and included options | ||
| Tooling, accessories and one-time software | ||
| Freight, unloading and rigging | ||
| Site preparation and utilities | ||
| Installation, training and acceptance run | ||
| Taxes and other one-time costs on the same basis | ||
| Estimated total |
Resolve the differences before placing an order
- Confirm quote expiry, lead time, who unloads and what your shop must supply before installation.
- Agree on the sample part, inspection method and what happens if the machine misses the acceptance criteria.
- Compare warranty, parts and service access. Track annual software, maintenance and consumables separately over the same period.